HPC and AI hosting
Purpose-built halls for high power density, direct-to-chip and immersion cooling, and latency-optimised peering for training and inference workloads at industrial scale.
Institutional datacenter infrastructure
Ymir designs, builds, and operates institutional-grade capacity for AI training, inference, and high-performance computing — sited where energy is abundant, governed where jurisdiction is clear, capitalised on horizons that match the asset.
100 MW
Operational capacity
4
Active jurisdictions
99.99 %
Uptime SLA
1.20
Target PUE
Capabilities
From dense AI training halls to long-tenor build-to-suit campuses, every Ymir asset is underwritten, designed, and operated by the same team.
Full capabilities register
Purpose-built halls for high power density, direct-to-chip and immersion cooling, and latency-optimised peering for training and inference workloads at industrial scale.
Multi-tenant suites with sovereign-grade security, redundant power paths, and uptime commitments engineered for regulated institutional counterparties.
Bespoke datacenter buildouts on long-term partnership economics — from substation to white space, delivered to specification under owner-side management.
Anatomy
The Ymir container compresses substation-to-rack engineering into a single shippable unit. Four systems, one accountable owner, one commissioning event.
Footprint • Q2 2026
100 MW
Operational capacity
Live across the operating portfolio.
4
Active jurisdictions
Gulf, Levant, Europe, and North Africa.
99.99 %
Uptime SLA
Tier III+ design and operating posture.
8760 h/yr
Resident operations
NOC and field engineering on every site.
Insights
Essays on compute infrastructure, energy markets, and the capital cycle that funds them — written by the team that builds and operates.
All notesEssay
Why infrastructure spend is reshaping power and capital markets — and why the unit of digital infrastructure is no longer the rack, but the megawatt block.
Perspective
On compute that does not cross borders, and why jurisdictional clarity has become a hard requirement for the institutions training frontier models.
Technical
Direct-to-chip, immersion, and what comes after — a field perspective on what is changing at 100 kW per rack and why thermal envelopes now dictate site selection.
Engage
Send a workload profile, sovereignty envelope, and target energise date. A feasibility note follows within five business days.